![](https://tri-austin.com/wp-content/uploads/2018/05/ShipboardShowerStall.jpg)
To optimize the new design, prototypes were designed, analyzed, manufactured, and tested. An economic analysis was performed to provide a cost estimate.
To optimize the new design, prototypes were designed, analyzed, manufactured, and tested. An economic analysis was performed to provide a cost estimate.